| Assessment Year | 2007 |
|---|---|
| Principal Product | Steel wire |
| NAICS | 331222: Steel Wire Drawing |
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
40,000
ft2
|
| Annual Production | 28,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $212,981 | 4,529,712 |
kWh
|
$0.047 |
| Electricity Demand | $108,226 | 12,697 |
kW-mo/yr
|
$8.52 |
| Natural Gas | $305,728 | 33,844 |
MMBtu
|
$9.03 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $165,537 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $104,537 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1133: Adjust burners for efficient operation | $51,254 | $6,000 | - | - |
$51,254
-
MMBtu
|
- | |
| 02 | 4.212: Adopt in-house material generation | $43,536 | $125,000 |
$(-7,043.0)
(-150,000)
kWh
|
$(-2,586.0)
-
kW-mo/yr
|
- | $53,165 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,464 | $46,995 |
$12,964
276,120
kWh
|
$4,760
-
kW-mo/yr
|
- | $(-260.0) | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,004 | $50 |
$2,197
46,800
kWh
|
$807
-
kW-mo/yr
|
- | - | |
| 05 | 2.4151: Develop a repair/replace policy | $870 | $863 |
$637
13,568
kWh
|
$233
-
kW-mo/yr
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $684 | $500 |
$498
10,601
kWh
|
$186
-
kW-mo/yr
|
- | - | |
| 07 | 2.2312: Minimize non-essential material in heat treatment process | $48,725 | $133,600 | - | - |
$48,725
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $165,537 | $313,008 |
$9,253
197,089
kWh
|
$3,400
-
kW-mo/yr
|
$99,979
-
MMBtu
|
$52,905 | ||
| TOTAL IMPLEMENTED | $104,537 | $141,013 |
$3,332
70,969
kWh
|
$1,226
-
kW-mo/yr
|
$99,979
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs