ITAC Assessment: WV0043
ITAC logo
ITAC Assessment: WV0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Conveyor steel belts
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 210,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,472 2,205,744
kWh
Natural Gas $47,937 6,835
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $123 $687 $123
3,810
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $7,021 $6,120 $7,021
218,054
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $787 $500 $787
24,326
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $399 $372 $399
12,309
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,644 $100 $3,644
113,130
kWh
-
06 2.2437: Recover waste heat from equipment $1,788 $530 - $1,788
-
MMBtu
07 2.7241: Install outside air damper / economizer on hvac unit $9,680 $6,985 $9,680
300,410
kWh
-
TOTAL RECOMMENDED $23,442 $15,294 $21,654
672,039
kWh
$1,788
-
MMBtu
TOTAL IMPLEMENTED $4,554 $1,287 $4,554
141,266
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs