ITAC Assessment: OR0368
ITAC logo
ITAC Assessment: OR0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wood pellets, cat litter
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area
n/a
Annual Production 28,073
ton
Production Hrs. Annual 4,896
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,063 3,097,800
kWh
Electricity Demand $23,743 99,024
kW-mo/yr
Natural Gas $211,258 57,644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings
01 2.4322: Use or replace with energy efficient substitutes $18,890 $30,000 $16,250
393,100
kWh
$2,640
-
kW-mo/yr
- - - -
02 2.2314: Replace heat treating oven with more efficient unit $43,540 $401,460 - - $44,000
-
MMBtu
- $(-460.0) -
03 2.4323: Use optimum size and capacity equipment $10,000 $4,040 - - - - $10,000 -
04 4.451: Add additional production shift $5,000 - - - - - - $5,000
05 3.5212: Regrind, reuse, or sell scrap plastic parts $1,515 $1,500 - - - $1,515
-
lb
- -
TOTAL RECOMMENDED $78,945 $437,000 $16,250
393,100
kWh
$2,640
-
kW-mo/yr
$44,000
-
MMBtu
$1,515
-
lb
$9,540 $5,000
TOTAL IMPLEMENTED $15,000 $4,040 - - - - $10,000 $5,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs