ITAC Assessment: SU0119
ITAC logo
ITAC Assessment: SU0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product airport lighting supports, BMF concrete forms
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range n/a
# of Employees 86
Plant Area 120,283
ft2
Annual Production 67,212
pieces
Production Hrs. Annual 3,024
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,068 1,123,500
kWh
Electricity Demand $61,559 4,851
kW-mo/yr
Electricity Fees $11,271 -
Natural Gas $70,258 12,790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,437

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,410 - $1,410
23,513
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $930 - $930
15,500
kWh
- -
03 2.2531: Re-size charging openings or add movable cover or door $5,956 $4,900 - $5,956
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $2,095 $727 - $2,095
-
MMBtu
-
05 2.2511: Insulate bare equipment $30,661 $208,950 - $30,661
-
MMBtu
-
06 4.112: Replace old machine with new automatic multi-station tool $46,417 $15,500 - - $46,417
07 4.514: Re-arrange equipment layout to reduce handling costs $2,456 - - - $2,456
TOTAL RECOMMENDED $89,925 $230,077 $2,340
39,013
kWh
$38,712
-
MMBtu
$48,873
TOTAL IMPLEMENTED $11,437 $5,627 $930
15,500
kWh
$8,051
-
MMBtu
$2,456
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs