Assessment Year | 2001 |
---|---|
Principal Product | airport lighting supports, BMF concrete forms |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | n/a |
# of Employees | 86 |
Plant Area |
120,283
ft2
|
Annual Production | 67,212
pieces
|
Production Hrs. Annual | 3,024
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $69,068 | 1,123,500 |
kWh
|
$0.061 |
Electricity Demand | $61,559 | 4,851 |
kW-mo/yr
|
$12.69 |
Electricity Fees | $11,271 | - |
|
- |
Natural Gas | $70,258 | 12,790 |
MMBtu
|
$5.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $89,925 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,437 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,410 | - |
$1,410
23,513
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $930 | - |
$930
15,500
kWh
|
- | - | |
03 | 2.2531: Re-size charging openings or add movable cover or door | $5,956 | $4,900 | - |
$5,956
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $2,095 | $727 | - |
$2,095
-
MMBtu
|
- | |
05 | 2.2511: Insulate bare equipment | $30,661 | $208,950 | - |
$30,661
-
MMBtu
|
- | |
06 | 4.112: Replace old machine with new automatic multi-station tool | $46,417 | $15,500 | - | - | $46,417 | |
07 | 4.514: Re-arrange equipment layout to reduce handling costs | $2,456 | - | - | - | $2,456 | |
TOTAL RECOMMENDED | $89,925 | $230,077 |
$2,340
39,013
kWh
|
$38,712
-
MMBtu
|
$48,873 | ||
TOTAL IMPLEMENTED | $11,437 | $5,627 |
$930
15,500
kWh
|
$8,051
-
MMBtu
|
$2,456 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs