ITAC Assessment: GT0910
ITAC logo
ITAC Assessment: GT0910
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Bread and Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 243
Plant Area 132,000
ft2
Annual Production 94,988,720
units
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $851,773 10,312,800
kWh
Natural Gas $303,268 52,988
MMBtu
Waste Disposal Costs
Water Usage $688 162
Tgal
TOTAL YEARLY COSTS $1,155,729
RECOMMENDED SAVINGS* $92,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,892

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $394 $189 $394
4,919
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,351 $14,618 $9,351
113,620
kWh
-
03 2.2511: Insulate bare equipment $541 $1,237 - $541
-
MMBtu
04 2.9114: Use solar heat to make electricty $82,347 $959,000 $82,347
997,341
kWh
-
TOTAL RECOMMENDED $92,632 $975,044 $92,092
1,115,880
kWh
$541
-
MMBtu
TOTAL IMPLEMENTED $9,892 $15,855 $9,351
113,620
kWh
$541
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs