ITAC Assessment: AM0644
ITAC logo
ITAC Assessment: AM0644
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Steel tubing and casing
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $100
M
to 500
M
# of Employees 194
Plant Area 200,000
ft2
Annual Production 130,000
ton
Production Hrs. Annual 8,712
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $864,357 18,711,098
kWh
Electricity Demand $365,992 56,659
kW-mo/yr
Electricity Fees $92,724 -
Natural Gas $783,805 249,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $419,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $408,720

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $211,550 $5,000 - - $81,890 - $129,660
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $51,450 $2,000 $44,500
824,000
kWh
$6,950
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $45,950 $50,800 $40,110
742,790
kWh
$5,840
-
kW-mo/yr
- - -
04 2.3212: Optimize plant power factor $43,700 $147,000 - $43,700
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $29,120 $50 $25,410
470,670
kWh
$3,710
-
kW-mo/yr
- - -
06 4.821: Pay bills on time to avoid late fees $24,370 - - - $24,370 - -
07 2.7145: Install skylights $11,090 $7,840 $11,090
205,400
kWh
- - - -
08 2.7124: Make a practice of turning off lights when not needed $2,190 - $2,190
40,500
kWh
- - - -
09 2.1131: Repair faulty insulation in furnaces, boilers, etc $390 $525 - - - $390
-
MMBtu
-
TOTAL RECOMMENDED $419,810 $213,215 $123,300
2,283,360
kWh
$60,200
-
kW-mo/yr
$106,260 $390
-
MMBtu
$129,660
TOTAL IMPLEMENTED $408,720 $205,375 $112,210
2,077,960
kWh
$60,200
-
kW-mo/yr
$106,260 $390
-
MMBtu
$129,660
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs