Assessment Year | 2013 |
---|---|
Principal Product | Steel tubing and casing |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $100 M to 500M |
# of Employees | 194 |
Plant Area |
200,000
ft2
|
Annual Production | 130,000
ton
|
Production Hrs. Annual | 8,712
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $864,357 | 18,711,098 |
kWh
|
$0.046 |
Electricity Demand | $365,992 | 56,659 |
kW-mo/yr
|
$6.46 |
Electricity Fees | $92,724 | - |
|
- |
Natural Gas | $783,805 | 249,079 |
MMBtu
|
$3.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $419,810 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $408,720 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $211,550 | $5,000 | - | - | $81,890 | - | $129,660 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $51,450 | $2,000 |
$44,500
824,000
kWh
|
$6,950
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $45,950 | $50,800 |
$40,110
742,790
kWh
|
$5,840
-
kW-mo/yr
|
- | - | - | |
04 | 2.3212: Optimize plant power factor | $43,700 | $147,000 | - |
$43,700
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $29,120 | $50 |
$25,410
470,670
kWh
|
$3,710
-
kW-mo/yr
|
- | - | - | |
06 | 4.821: Pay bills on time to avoid late fees | $24,370 | - | - | - | $24,370 | - | - | |
07 | 2.7145: Install skylights | $11,090 | $7,840 |
$11,090
205,400
kWh
|
- | - | - | - | |
08 | 2.7124: Make a practice of turning off lights when not needed | $2,190 | - |
$2,190
40,500
kWh
|
- | - | - | - | |
09 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $390 | $525 | - | - | - |
$390
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $419,810 | $213,215 |
$123,300
2,283,360
kWh
|
$60,200
-
kW-mo/yr
|
$106,260 |
$390
-
MMBtu
|
$129,660 | ||
TOTAL IMPLEMENTED | $408,720 | $205,375 |
$112,210
2,077,960
kWh
|
$60,200
-
kW-mo/yr
|
$106,260 |
$390
-
MMBtu
|
$129,660 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs