ITAC Assessment: OR0582
ITAC logo
ITAC Assessment: OR0582
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product I joists
NAICS 321213: Engineered Wood Member (except Truss) Manufacturing
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 110
Plant Area 275,000
ft2
Annual Production 365,000,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $412,076 8,213,600
kWh
Electricity Demand $215,687 35,712
kW-mo/yr
Natural Gas $67,598 7,417
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.1231: Establish burner maintenance schedule for boilers $720 $500 - - $720
-
MMBtu
- -
02 2.4224: Upgrade controls on compressors $25,857 $33,400 $27,122
525,120
kWh
$(-1,265.3)
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,291 $23,135 $9,585
185,585
kWh
$(-111.4)
-
kW-mo/yr
- $246 $1,571
04 2.5121: Redesign flow to minimize mass transfer length $14,435 $34,000 $17,135
331,760
kWh
$(-2,700.0)
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $52,304 $91,035 $53,843
1,042,465
kWh
$(-4,076.6)
-
kW-mo/yr
$720
-
MMBtu
$246 $1,571
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs