| Assessment Year | 2012 |
|---|---|
| Principal Product | I joists |
| NAICS | 321213: Engineered Wood Member (except Truss) Manufacturing |
| SIC | 2439: Structural Wood Members, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 110 |
| Plant Area |
275,000
ft2
|
| Annual Production | 365,000,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $412,076 | 8,213,600 |
kWh
|
$0.050 |
| Electricity Demand | $215,687 | 35,712 |
kW-mo/yr
|
$6.04 |
| Natural Gas | $67,598 | 7,417 |
MMBtu
|
$9.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $52,304 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1231: Establish burner maintenance schedule for boilers | $720 | $500 | - | - |
$720
-
MMBtu
|
- | - | |
| 02 | 2.4224: Upgrade controls on compressors | $25,857 | $33,400 |
$27,122
525,120
kWh
|
$(-1,265.3)
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,291 | $23,135 |
$9,585
185,585
kWh
|
$(-111.4)
-
kW-mo/yr
|
- | $246 | $1,571 | |
| 04 | 2.5121: Redesign flow to minimize mass transfer length | $14,435 | $34,000 |
$17,135
331,760
kWh
|
$(-2,700.0)
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $52,304 | $91,035 |
$53,843
1,042,465
kWh
|
$(-4,076.6)
-
kW-mo/yr
|
$720
-
MMBtu
|
$246 | $1,571 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs