ITAC Assessment: MS0307
ITAC logo
ITAC Assessment: MS0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Laminated Beams
NAICS 321213: Engineered Wood Member (except Truss) Manufacturing
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 51,894
ft2
Annual Production 4,822
thousand feet
Production Hrs. Annual 2,805
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,643 988,206
kWh
Electricity Fees $38,293 -
Natural Gas $6,979 485
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,547 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $15,270 $1,000 - - $15,270
02 2.7231: Use radiant heater for spot heating $8,652 $7,384 - - $8,652
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,621 $156 $1,343
78,689
kWh
$3,278 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $677 $3,300 $201
11,420
kWh
$476 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $327 $3,053 $97
5,537
kWh
$230 -
TOTAL RECOMMENDED $29,547 $14,893 $1,641
95,646
kWh
$3,984 $23,922
TOTAL IMPLEMENTED $28,870 $11,593 $1,440
84,226
kWh
$3,508 $23,922
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs