ITAC Assessment: CO0125
ITAC logo
ITAC Assessment: CO0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product INJECTION MOLDED PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area
n/a
Annual Production 900,000
lb
Production Hrs. Annual 4,836
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,083 2,483,001
kWh
Natural Gas $3,123 787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,221

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $4,009 $4,600 $4,009
71,219
kWh
-
02 2.2511: Insulate bare equipment $213 $50 $213
3,810
kWh
-
03 2.8121: Apply for tax-free status for energy purchases $806 $250 $791
-
kWh
$15
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $415 $288 $415
7,327
kWh
-
TOTAL RECOMMENDED $5,443 $5,188 $5,428
82,356
kWh
$15
-
MMBtu
TOTAL IMPLEMENTED $1,221 $538 $1,206
7,327
kWh
$15
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs