Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Engineered wood member (except truss) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0628 #06 Y:2018 Optimize plant power factor $785 $1,500
NC0628 #05 Y:2018 Size electric motors for peak operating efficiency $29,932 $120,000
NC0628 #04 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $26,500 $70,000
NC0628 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $580 $200
NC0628 #02 Y:2018 Install occupancy sensors $45 $100
NC0628 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $4,628 $15,967
BS0080 #07 Y:2016 Use waste heat from hot flue gases to preheat $5,626 $8,468
BS0080 #06 Y:2016 Utilize controls to operate equipment only when needed $264 $417
BS0080 #05 Y:2016 Utilize energy-efficient belts and other improved mechanisms $560 $500
BS0080 #04 Y:2016 Use or replace with energy efficient substitutes $4,926 $8,600
BS0080 #03 Y:2016 Install compressor air intakes in coolest locations $414 $196
BS0080 #02 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $2,443 $736
BS0080 #01 Y:2016 Turn off equipment when not in use $15,244 $1,250
OR0639 #05 Y:2014 Optimize plant power factor $3,528 $15,201
OR0639 #04 Y:2014 Insulate bare equipment $7,377 $7,643
OR0639 #03 Y:2014 Reschedule plant operations or reduce load to avoid peaks $10,572 $7,500
OR0639 #02 Y:2014 Utilize higher efficiency lamps and/or ballasts $8,461 $360
OR0639 #01 Y:2014 Improve combustion control capability $14,677 $12,315
OR0628 #09 Y:2014 Replace hydraulic / pneumatic equipment with electric equipment $948 $676
OR0628 #08 Y:2014 Reduce the pressure of compressed air to the minimum required $877 $500