ITAC Assessment: BS0080
ITAC logo
ITAC Assessment: BS0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Glue Laminated Wood Beams
NAICS 321213: Engineered Wood Member (except Truss) Manufacturing
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 49
Plant Area 154,000
ft2
Annual Production 15,200,000
thousand feet
Production Hrs. Annual 2,500
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,727 2,982,397
kWh
Electricity Demand $77,820 16,218
kW-mo/yr
Electricity Fees $3,732 -
Wood $392,410 43,118
MMBtu
TOTAL YEARLY COSTS $611,689
RECOMMENDED SAVINGS* $29,477 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,511

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings
01 2.6218: Turn off equipment when not in use $15,244 $1,250 $15,244
330,105
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,443 $736 $2,443
52,910
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $414 $196 $414
8,956
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $4,926 $8,600 $3,079
66,679
kWh
$1,847
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $560 $500 $349
7,552
kWh
$211
-
kW-mo/yr
-
06 2.6231: Utilize controls to operate equipment only when needed $264 $417 $264
5,722
kWh
- -
07 2.2414: Use waste heat from hot flue gases to preheat $5,626 $8,468 - - $5,626
-
MMBtu
TOTAL RECOMMENDED $29,477 $20,167 $21,793
471,924
kWh
$2,058
-
kW-mo/yr
$5,626
-
MMBtu
TOTAL IMPLEMENTED $18,511 $2,903 $18,300
396,289
kWh
$211
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs