Assessment Year | 2016 |
---|---|
Principal Product | Glue Laminated Wood Beams |
NAICS | 321213: Engineered Wood Member (except Truss) Manufacturing |
SIC | 2439: Structural Wood Members, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 49 |
Plant Area |
154,000
ft2
|
Annual Production | 15,200,000
thousand feet
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $137,727 | 2,982,397 |
kWh
|
$0.046 |
Electricity Demand | $77,820 | 16,218 |
kW-mo/yr
|
$4.80 |
Electricity Fees | $3,732 | - |
|
- |
Wood | $392,410 | 43,118 |
MMBtu
|
$9.10 |
TOTAL YEARLY COSTS | $611,689 | |||
RECOMMENDED SAVINGS* | $29,477 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,511 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $15,244 | $1,250 |
$15,244
330,105
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,443 | $736 |
$2,443
52,910
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $414 | $196 |
$414
8,956
kWh
|
- | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $4,926 | $8,600 |
$3,079
66,679
kWh
|
$1,847
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $560 | $500 |
$349
7,552
kWh
|
$211
-
kW-mo/yr
|
- | |
06 | 2.6231: Utilize controls to operate equipment only when needed | $264 | $417 |
$264
5,722
kWh
|
- | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $5,626 | $8,468 | - | - |
$5,626
-
MMBtu
|
|
TOTAL RECOMMENDED | $29,477 | $20,167 |
$21,793
471,924
kWh
|
$2,058
-
kW-mo/yr
|
$5,626
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,511 | $2,903 |
$18,300
396,289
kWh
|
$211
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs