Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

110

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Softwood veneer and plywood manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0761 #04 Y:2022 Modify facility to avoid excess maintenance costs $31,013 $150,000
OR0761 #03 Y:2022 Optimize plant power factor $6,236 $26,406
OR0761 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $9,934 $9,934
OR0761 #01 Y:2022 Reduce the pressure of compressed air to the minimum required $1,913 $1,078
OR0727 #04 Y:2019 Use or replace with energy efficient substitutes $1,255 $770
OR0727 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $6,870 $19,006
OR0727 #02 Y:2019 Adjust / maintain fork lift trucks for most efficient operation $125,609 $904,500
OR0727 #01 Y:2019 Add equipment/ operators to reduce production bottleneck $2,245,906 $300,000
OR0658 #04 Y:2015 Use or replace with energy efficient substitutes $20,781 -
OR0658 #03 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $54,203 $59,203
OR0658 #02 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $680,062 $427,000
OR0658 #01 Y:2015 Modify current incentive program $22,712 $60,000
OR0640 #05 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $11,092 $12,092
OR0640 #04 Y:2014 Install equipment to utilize waste fuel $20,241 $67,550
OR0640 #03 Y:2014 Install soft-start to eliminate nuisance trips $1,298 $1,020
OR0640 #02 Y:2014 Install soft-start to eliminate nuisance trips $2,455 -
OR0640 #01 Y:2014 Replace hydraulic / pneumatic equipment with electric equipment $131,605 $242,261
OR0635 #07 Y:2014 Upgrade controls on compressors $40,819 $43,800
OR0635 #06 Y:2014 Install spectral reflectors / delamp $181,002 $170,561
OR0635 #05 Y:2014 Replace existing equipment with more suitable substitutes $23,961 $9,068