ITAC Assessment: OR0640
ITAC logo
ITAC Assessment: OR0640
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Plywood
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $100
M
to 500
M
# of Employees 390
Plant Area 6,423,000
ft2
Annual Production 316,955,697
thousand feet
Production Hrs. Annual 8,712
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,532,514 31,884,000
kWh
Electricity Demand $507,220 119,779
kW-mo/yr
Electricity Fees $84,389 -
Natural Gas $45,799 5,923
MMBtu
LPG $30,194 1,824
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,691 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $142,697

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $131,605 $242,261 $104,903
2,081,399
kWh
$26,702
-
kW-mo/yr
-
02 2.4112: Install soft-start to eliminate nuisance trips $2,455 - $2,455
46,591
kWh
- -
03 2.4112: Install soft-start to eliminate nuisance trips $1,298 $1,020 $1,298
25,955
kWh
- -
04 2.1336: Install equipment to utilize waste fuel $20,241 $67,550 $(-8,835.0)
(-154,290)
kWh
$(-1,118.0)
-
kW-mo/yr
$30,194
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,092 $12,092 $9,689
193,702
kWh
$1,403
-
kW-mo/yr
-
TOTAL RECOMMENDED $166,691 $322,923 $109,510
2,193,357
kWh
$26,987
-
kW-mo/yr
$30,194
-
MMBtu
TOTAL IMPLEMENTED $142,697 $254,353 $114,592
2,275,101
kWh
$28,105
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs