Assessment Year | 2002 |
---|---|
Principal Product | Rotational molded plastic products |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 40 |
Plant Area |
100,000
ft2
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,754 | 797,040 |
kWh
|
$0.069 |
Natural Gas | $123,908 | 17,486 |
MMBtu
|
$7.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $163,375 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $213 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $99,990 | $64,500 |
$(-10,130.0)
(-151,200)
kWh
|
- | $(-57,600.0) | - | $167,720 | |
02 | 4.514: Re-arrange equipment layout to reduce handling costs | $37,195 | $95,000 |
$7,528
103,400
kWh
|
$8,217
-
MMBtu
|
$18,000 | $3,450 | - | |
03 | 2.2437: Recover waste heat from equipment | $24,914 | $12,000 | - |
$24,914
-
MMBtu
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $799 | $2,372 |
$799
11,920
kWh
|
- | - | - | - | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $213 | - |
$213
3,175
kWh
|
- | - | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $133 | $15 |
$133
1,984
kWh
|
- | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $131 | $406 |
$131
1,947
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $163,375 | $174,293 |
$(-1,326.0)
(-28,774)
kWh
|
$33,131
-
MMBtu
|
$(-39,600.0) | $3,450 | $167,720 | ||
TOTAL IMPLEMENTED | $213 | - |
$213
3,175
kWh
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs