ITAC Assessment: OK1041
ITAC logo
ITAC Assessment: OK1041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Fabricated metal parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 130,000
ft2
Annual Production 3,645,498
lb
Production Hrs. Annual 2,340
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,157 628,928
kWh
Electricity Demand $51,597 2,495
kW-mo/yr
Electricity Fees $1,421 -
Natural Gas $6,408 995
MMBtu
Waste Disposal Costs
Water Usage $5,748 1,116
Tgal
TOTAL YEARLY COSTS $90,331
RECOMMENDED SAVINGS* $17,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,337 $28,697 $4,286
107,157
kWh
$10,051
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,223 $1,690 $1,223
30,576
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $896 $1,927 $896
22,388
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $180 - $180
4,493
kWh
-
05 2.7211: Clean and maintain refrigerant condensers and towers $614 $219 $180
4,491
kWh
$434
-
kW-mo/yr
TOTAL RECOMMENDED $17,250 $32,533 $6,765
169,105
kWh
$10,485
-
kW-mo/yr
TOTAL IMPLEMENTED $17,070 $32,533 $6,585
164,612
kWh
$10,485
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs