*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product tables and chairs
NAICS 337127: Institutional Furniture Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 310
Plant Area 30,000
ft2
Annual Production 31,875,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,486 3,298,330
kWh
Electricity Demand $102,198 11,859
kW-mo/yr
Electricity Fees $39,964 -
Natural Gas $141,648 29,433
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,573

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $21,193 $325 - - $21,193
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $8,711 $3,315 $(-396.0)
(-12,994)
kWh
$(-383.0)
-
kW-mo/yr
$9,490
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $5,381 $7,500 $(-113.0)
(-3,701)
kWh
$(-53.0)
-
kW-mo/yr
$5,547
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $5,006 $8,929 - - $5,006
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $1,004 $244 $562
18,436
kWh
$442
-
kW-mo/yr
- -
06 2.6127: Maintain air filters by cleaning or replacement $12,376 $1,292 - - - $12,376
TOTAL RECOMMENDED $53,671 $21,605 $53
1,741
kWh
$6
-
kW-mo/yr
$41,236
-
MMBtu
$12,376
TOTAL IMPLEMENTED $34,573 $1,861 $562
18,436
kWh
$442
-
kW-mo/yr
$21,193
-
MMBtu
$12,376
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs