Assessment Year | 2004 |
---|---|
Principal Product | tables and chairs |
NAICS | 337127: Institutional Furniture Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 310 |
Plant Area |
30,000
ft2
|
Annual Production | 31,875,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,486 | 3,298,330 |
kWh
|
$0.028 |
Electricity Demand | $102,198 | 11,859 |
kW-mo/yr
|
$8.62 |
Electricity Fees | $39,964 | - |
|
- |
Natural Gas | $141,648 | 29,433 |
MMBtu
|
$4.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,671 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,573 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $21,193 | $325 | - | - |
$21,193
-
MMBtu
|
- | |
02 | 2.2437: Recover waste heat from equipment | $8,711 | $3,315 |
$(-396.0)
(-12,994)
kWh
|
$(-383.0)
-
kW-mo/yr
|
$9,490
-
MMBtu
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,381 | $7,500 |
$(-113.0)
(-3,701)
kWh
|
$(-53.0)
-
kW-mo/yr
|
$5,547
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $5,006 | $8,929 | - | - |
$5,006
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,004 | $244 |
$562
18,436
kWh
|
$442
-
kW-mo/yr
|
- | - | |
06 | 2.6127: Maintain air filters by cleaning or replacement | $12,376 | $1,292 | - | - | - | $12,376 | |
TOTAL RECOMMENDED | $53,671 | $21,605 |
$53
1,741
kWh
|
$6
-
kW-mo/yr
|
$41,236
-
MMBtu
|
$12,376 | ||
TOTAL IMPLEMENTED | $34,573 | $1,861 |
$562
18,436
kWh
|
$442
-
kW-mo/yr
|
$21,193
-
MMBtu
|
$12,376 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs