ITAC Assessment: OR0635
ITAC logo
ITAC Assessment: OR0635
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Plywood and LVL
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 317
Plant Area 450,000
ft2
Annual Production 120,000,000
units
Production Hrs. Annual 4,992
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,128,644 21,416,400
kWh
Electricity Demand $294,462 40,898
kW-mo/yr
Electricity Fees $2,520 -
LPG $173,372 9,592
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $352,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,475 $7,174 $29,475
561,751
kWh
- - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,287 $1,628 $6,287
119,816
kWh
- - - -
03 2.2121: Increase amount of condensate returned $56,191 $56,191 - - - - $56,191
-
Tgal
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,844 $15,843 $12,337
234,090
kWh
$2,507
-
kW-mo/yr
- - -
05 4.652: Replace existing equipment with more suitable substitutes $23,961 $9,068 $23,961
454,665
kWh
- - - -
06 2.7144: Install spectral reflectors / delamp $181,002 $170,561 $130,333
2,473,114
kWh
$17,393
-
kW-mo/yr
$3,381 $29,895 -
07 2.4224: Upgrade controls on compressors $40,819 $43,800 $45,531
863,970
kWh
$(-4,712.0)
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $352,579 $304,265 $247,924
4,707,406
kWh
$15,188
-
kW-mo/yr
$3,381 $29,895 $56,191
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs