Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Softwood veneer and plywood manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0532 #09 Y:2014 Reduce the pressure of compressed air to the minimum required $15,703 $500
NC0532 #08 Y:2014 Repair and eliminate steam leaks $990 $450
NC0532 #07 Y:2014 Install / repair insulation on steam lines $1,753 $1,620
NC0532 #06 Y:2014 Repair or replace steam traps $17,917 $8,000
NC0532 #05 Y:2014 Use heat from boiler blowdown to preheat boiler feed water $18,636 $45,000
NC0532 #04 Y:2014 Utilize higher efficiency lamps and/or ballasts $353 $438
NC0532 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $773 $240
NC0532 #02 Y:2014 Utilize higher efficiency lamps and/or ballasts $29,143 $73,960
NC0532 #01 Y:2014 Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $48,749 $105,000
OR0640 #05 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $11,092 $12,092
OR0640 #04 Y:2014 Install equipment to utilize waste fuel $20,241 $67,550
OR0640 #03 Y:2014 Install soft-start to eliminate nuisance trips $1,298 $1,020
OR0640 #02 Y:2014 Install soft-start to eliminate nuisance trips $2,455 -
OR0640 #01 Y:2014 Replace hydraulic / pneumatic equipment with electric equipment $131,605 $242,261
OR0635 #07 Y:2014 Upgrade controls on compressors $40,819 $43,800
OR0635 #06 Y:2014 Install spectral reflectors / delamp $181,002 $170,561
OR0635 #05 Y:2014 Replace existing equipment with more suitable substitutes $23,961 $9,068
OR0635 #04 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $14,844 $15,843
OR0635 #03 Y:2014 Increase amount of condensate returned $56,191 $56,191
OR0635 #02 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $6,287 $1,628