196
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Softwood veneer and plywood manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0827 #07 Y:2026 | 07 | 2026 | Use solar heat to make electricty | $34,776 | $600,754 |
n/a
|
| OR0827 #06 Y:2026 | 06 | 2026 | Optimize plant power factor | $7,574 | $55,435 |
n/a
|
| OR0827 #05 Y:2026 | 05 | 2026 | Cover open tanks | $1,065 | $184 |
n/a
|
| OR0827 #04 Y:2026 | 04 | 2026 | Recover waste heat from equipment | $78,209 | $1,612 |
n/a
|
| OR0827 #03 Y:2026 | 03 | 2026 | Use optimum size and capacity equipment | $2,712,540 | $32,000 |
n/a
|
| OR0827 #02 Y:2026 | 02 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $2,685 | - |
n/a
|
| OR0827 #01 Y:2026 | 01 | 2026 | Reduce the pressure of compressed air to the minimum required | $6,835 | - |
n/a
|
| UW2602 #06 Y:2026 | 06 | 2026 | Optimize plant power factor | $61,576 | $37,084 |
n/a
|
| UW2602 #05 Y:2026 | 05 | 2026 | Repair and eliminate steam leaks | $38,800 | $7,287 |
n/a
|
| UW2602 #04 Y:2026 | 04 | 2026 | Use or replace with energy efficient substitutes | $10,764 | $32,940 |
n/a
|
| UW2602 #03 Y:2026 | 03 | 2026 | Install occupancy sensors | $20,293 | $15,688 |
n/a
|
| UW2602 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $6,269 | $7,520 |
n/a
|
| UW2602 #01 Y:2026 | 01 | 2026 | Burn wood by-products for heat | $362,644 | $6,038,074 |
n/a
|
| OR0761 #04 Y:2022 | 04 | 2022 | Modify facility to avoid excess maintenance costs | $31,013 | $150,000 | |
| OR0761 #03 Y:2022 | 03 | 2022 | Optimize plant power factor | $6,236 | $26,406 | |
| OR0761 #02 Y:2022 | 02 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,934 | $9,934 | |
| OR0761 #01 Y:2022 | 01 | 2022 | Reduce the pressure of compressed air to the minimum required | $1,913 | $1,078 | |
| UA0259 #05 Y:2022 | 05 | 2022 | Optimize plant power factor | $50,082 | $26,090 | |
| UA0259 #04 Y:2022 | 04 | 2022 | Use waste heat to produce steam to drive a steam turbine-generator | $225,594 | $969,631 | |
| UA0259 #03 Y:2022 | 03 | 2022 | Recover heat from exhausted steam, hot air or hot water | $100,047 | $47,295 |