Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

202

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Hardwood veneer and plywood manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0573 #05 Y:2011 Install / repair insulation on steam lines $11,543 $7,806
OR0573 #04 Y:2011 Use or replace with energy efficient substitutes $8,821 $7,045
OR0573 #03 Y:2011 Use or replace with energy efficient substitutes $5,064 $7,045
OR0573 #02 Y:2011 Use or replace with energy efficient substitutes $18,705 $7,045
OR0573 #01 Y:2011 Reduce combustion air flow to optimum $37,057 $18,500
OR0564 #06 Y:2010 Install occupancy sensors $7,248 $31,290
OR0564 #05 Y:2010 Use optimum thickness insulation $64,658 $105,222
OR0564 #04 Y:2010 Utilize energy-efficient belts and other improved mechanisms $2,849 $7,575
OR0564 #03 Y:2010 Upgrade controls on compressors $9,666 $40,000
OR0564 #02 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $31,314 $31,314
OR0564 #01 Y:2010 Install soft-start to eliminate nuisance trips $11,375 $32,340
OR0555 #04 Y:2010 Utilize energy-efficient belts and other improved mechanisms $2,054 $1
OR0555 #03 Y:2010 Remove or close off unneeded compressed air lines $15,978 $11,900
OR0555 #02 Y:2010 Install smaller boiler (increase high fire duty cycle) $32,115 $37,100
OR0555 #01 Y:2010 Improve combustion control capability $257,883 $405,450
WV0399 #13 Y:2009 Utilize higher efficiency lamps and/or ballasts $1,498 $4,153
WV0399 #12 Y:2009 Reduce the pressure of compressed air to the minimum required $2,246 $26
WV0399 #11 Y:2009 Recover waste heat from equipment $2,309 $4,560
WV0399 #10 Y:2009 Insulate bare equipment $2,955 $3,544
WV0399 #09 Y:2009 Establish a predictive maintenance program $3,930 $1,000