ITAC Assessment: OR0573
ITAC logo
ITAC Assessment: OR0573
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Hardwood Plywood
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 328,548
ft2
Annual Production 2,920,000
pieces
Production Hrs. Annual 7,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $762,416 16,394,400
kWh
Electricity Demand $270,059 50,763
kW-mo/yr
Natural Gas $588,897 107,146
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $153,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Wood Savings
01 2.1113: Reduce combustion air flow to optimum $37,057 $18,500 - - $37,057
-
MMBtu
-
02 2.4322: Use or replace with energy efficient substitutes $18,705 $7,045 $13,659
282,143
kWh
$5,046
-
kW-mo/yr
- -
03 2.4322: Use or replace with energy efficient substitutes $5,064 $7,045 $3,698
76,389
kWh
$1,366
-
kW-mo/yr
- -
04 2.4322: Use or replace with energy efficient substitutes $8,821 $7,045 $6,441
133,049
kWh
$2,380
-
kW-mo/yr
- -
05 2.2136: Install / repair insulation on steam lines $11,543 $7,806 - - - $11,543
-
MMBtu
06 2.2127: Flash condensate to produce lower pressure steam $71,712 $65,575 - - - $71,712
-
MMBtu
07 2.4112: Install soft-start to eliminate nuisance trips $987 $4,800 $721
14,889
kWh
$266
-
kW-mo/yr
- -
TOTAL RECOMMENDED $153,889 $117,816 $24,519
506,470
kWh
$9,058
-
kW-mo/yr
$37,057
-
MMBtu
$83,255
-
MMBtu
TOTAL IMPLEMENTED $11,543 $7,806 - - - $11,543
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs