Assessment Year | 2011 |
---|---|
Principal Product | Hardwood Plywood |
NAICS | 321211: Hardwood Veneer and Plywood Manufacturing |
SIC | 2435: Hardwood Veneer and Plywood |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
328,548
ft2
|
Annual Production | 2,920,000
pieces
|
Production Hrs. Annual | 7,000
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $762,416 | 16,394,400 |
kWh
|
$0.047 |
Electricity Demand | $270,059 | 50,763 |
kW-mo/yr
|
$5.32 |
Natural Gas | $588,897 | 107,146 |
MMBtu
|
$5.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $153,889 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,543 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $37,057 | $18,500 | - | - |
$37,057
-
MMBtu
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $18,705 | $7,045 |
$13,659
282,143
kWh
|
$5,046
-
kW-mo/yr
|
- | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $5,064 | $7,045 |
$3,698
76,389
kWh
|
$1,366
-
kW-mo/yr
|
- | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $8,821 | $7,045 |
$6,441
133,049
kWh
|
$2,380
-
kW-mo/yr
|
- | - | |
05 | 2.2136: Install / repair insulation on steam lines | $11,543 | $7,806 | - | - | - |
$11,543
-
MMBtu
|
|
06 | 2.2127: Flash condensate to produce lower pressure steam | $71,712 | $65,575 | - | - | - |
$71,712
-
MMBtu
|
|
07 | 2.4112: Install soft-start to eliminate nuisance trips | $987 | $4,800 |
$721
14,889
kWh
|
$266
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $153,889 | $117,816 |
$24,519
506,470
kWh
|
$9,058
-
kW-mo/yr
|
$37,057
-
MMBtu
|
$83,255
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,543 | $7,806 | - | - | - |
$11,543
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs