Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

202

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Hardwood veneer and plywood manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0482 #03 Y:2014 Use most efficient type of electric motors $960 $2,575
SD0482 #02 Y:2014 Use photocell controls $1,780 $3,145
SD0482 #01 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $2,705 $900
UA0088 #09 Y:2012 Optimize plant power factor $13,879 $21,400
UA0088 #08 Y:2012 Repair and eliminate steam leaks $1,371 $2,780
UA0088 #07 Y:2012 Use most efficient type of electric motors $856 $2,722
UA0088 #06 Y:2012 Utilize energy-efficient belts and other improved mechanisms $912 $306
UA0088 #05 Y:2012 Lower temperature during the winter season and vice-versa $10,103 $160
UA0088 #04 Y:2012 Reduce the pressure of compressed air to the minimum required $8,268 $1,600
UA0088 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $15,088 $2,500
UA0088 #02 Y:2012 Use photocell controls $687 $651
UA0088 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $15,558 $22,841
NC0463 #06 Y:2012 Recover waste heat from equipment $4,367 $5,000
NC0463 #05 Y:2012 Utilize higher efficiency lamps and/or ballasts $24 $135
NC0463 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,015 $1,124
NC0463 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,208 $200
NC0463 #02 Y:2012 Utilize energy-efficient belts and other improved mechanisms $2,159 $1,400
NC0463 #01 Y:2012 Turn off equipment when not in use $15,737 $15,000
OR0573 #07 Y:2011 Install soft-start to eliminate nuisance trips $987 $4,800
OR0573 #06 Y:2011 Flash condensate to produce lower pressure steam $71,712 $65,575