ITAC Assessment: SD0482
ITAC logo
ITAC Assessment: SD0482
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Flooring
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 142,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,168
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,408 1,441,690
kWh
Electricity Demand $82,973 7,543
kW-mo/yr
Electricity Fees $23,771 -
Natural Gas $24,080 3,633
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,705 $900 $824
29,351
kWh
$1,881
-
kW-mo/yr
02 2.7134: Use photocell controls $1,780 $3,145 $853
30,484
kWh
$927
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $960 $2,575 $303
10,834
kWh
$657
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $881 $855 $190
6,803
kWh
$691
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $475 $1,350 $475
16,948
kWh
-
TOTAL RECOMMENDED $6,801 $8,825 $2,645
94,420
kWh
$4,156
-
kW-mo/yr
TOTAL IMPLEMENTED $5,445 $6,620 $1,980
70,669
kWh
$3,465
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs