ITAC Assessment: GT0419
ITAC logo
ITAC Assessment: GT0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product VENDING FOODS
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,718 270,516
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4322: Use or replace with energy efficient substitutes $3,040 $8,500 $3,040
29,601
kWh
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $460 $600 $460
4,396
kWh
03 2.7314: Reduce ventilation air $340 $800 $340
3,224
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $117 $52 $117
1,172
kWh
TOTAL RECOMMENDED $3,957 $9,952 $3,957
38,393
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs