Assessment Year | 2000 |
---|---|
Principal Product | HVAC replacement parts |
NAICS |
n/a
|
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 137 |
Plant Area |
352,000
ft2
|
Annual Production | 3,300,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,586 | 2,023,740 |
kWh
|
$0.035 |
Electricity Demand | $34,350 | 6,000 |
kW-mo/yr
|
$5.73 |
Natural Gas | $14,381 | 4,750 |
MMBtu
|
$3.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,991 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Gaseous Waste Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,701 | $169 |
$2,084
72,098
kWh
|
$2,617
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $833 | $1,167 |
$459
15,826
kWh
|
$374
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $604 | $2,000 |
$337
11,723
kWh
|
$267
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.6218: Turn off equipment when not in use | $276 | $45 |
$170
5,862
kWh
|
$106
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $79 | $25 |
$31
1,172
kWh
|
$48
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 3.4156: Use flow control valves on equipment to optimize water use | $1,636 | $675 | - | - |
$629
-
Tgal
|
- | - | - |
$1,007
-
Tgal
|
|
07 | 4.131: Modify process to reduce material use/cost | $448 | $890 | - | - | - |
$448
-
lb
|
- | - | - | |
08 | 4.431: Train operators for maximum operating efficiency | $4,883 | $123 | - | - | - | - | $4,883 | - | - | |
09 | 4.812: Apply for investment incentives | $3,531 | $250 | - | - | - | - | - | $3,531 | - | |
TOTAL RECOMMENDED | $16,991 | $5,344 |
$3,081
106,681
kWh
|
$3,412
-
kW-mo/yr
|
$629
-
Tgal
|
$448
-
lb
|
$4,883 | $3,531 |
$1,007
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Gaseous Waste Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs