ITAC Assessment: IA0242
ITAC logo
ITAC Assessment: IA0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product HVAC replacement parts
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area 352,000
ft2
Annual Production 3,300,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,586 2,023,740
kWh
Electricity Demand $34,350 6,000
kW-mo/yr
Natural Gas $14,381 4,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Gaseous Waste Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,701 $169 $2,084
72,098
kWh
$2,617
-
kW-mo/yr
- - - - -
02 2.4221: Install compressor air intakes in coolest locations $833 $1,167 $459
15,826
kWh
$374
-
kW-mo/yr
- - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $604 $2,000 $337
11,723
kWh
$267
-
kW-mo/yr
- - - - -
04 2.6218: Turn off equipment when not in use $276 $45 $170
5,862
kWh
$106
-
kW-mo/yr
- - - - -
05 2.6212: Turn off equipment during breaks, reduce operating time $79 $25 $31
1,172
kWh
$48
-
kW-mo/yr
- - - - -
06 3.4156: Use flow control valves on equipment to optimize water use $1,636 $675 - - $629
-
Tgal
- - - $1,007
-
Tgal
07 4.131: Modify process to reduce material use/cost $448 $890 - - - $448
-
lb
- - -
08 4.431: Train operators for maximum operating efficiency $4,883 $123 - - - - $4,883 - -
09 4.812: Apply for investment incentives $3,531 $250 - - - - - $3,531 -
TOTAL RECOMMENDED $16,991 $5,344 $3,081
106,681
kWh
$3,412
-
kW-mo/yr
$629
-
Tgal
$448
-
lb
$4,883 $3,531 $1,007
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Gaseous Waste Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs