Assessment Year | 2012 |
---|---|
Principal Product | Hardwood Plywood |
NAICS | 321211: Hardwood Veneer and Plywood Manufacturing |
SIC | 2435: Hardwood Veneer and Plywood |
Sales Range | $10 M to 50M |
# of Employees | 72 |
Plant Area |
210,000
ft2
|
Annual Production | 25,000
thousand feet
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $622,649 | 11,482,636 |
kWh
|
$0.054 |
Electricity Demand | $78,813 | 27,084 |
kW-mo/yr
|
$2.91 |
Electricity Fees | $61,452 | - |
|
- |
Wood | $68,985 | 50,261 |
MMBtu
|
$1.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,722 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,931 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Wood Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,558 | $22,841 |
$13,526
249,420
kWh
|
$1,269
-
kW-mo/yr
|
$763 | - | |
02 | 2.7134: Use photocell controls | $687 | $651 |
$653
12,038
kWh
|
- | $34 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,088 | $2,500 |
$13,369
246,519
kWh
|
$979
-
kW-mo/yr
|
$740 | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,268 | $1,600 |
$7,169
132,193
kWh
|
$693
-
kW-mo/yr
|
$406 | - | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $10,103 | $160 |
$9,607
177,160
kWh
|
- | $496 | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $912 | $306 |
$791
14,595
kWh
|
$76
-
kW-mo/yr
|
$45 | - | |
07 | 2.4133: Use most efficient type of electric motors | $856 | $2,722 |
$709
13,072
kWh
|
$105
-
kW-mo/yr
|
$42 | - | |
08 | 2.2135: Repair and eliminate steam leaks | $1,371 | $2,780 | - | - | - |
$1,371
-
MMBtu
|
|
09 | 2.3212: Optimize plant power factor | $13,879 | $21,400 | - |
$13,198
-
kW-mo/yr
|
$681 | - | |
TOTAL RECOMMENDED | $66,722 | $54,960 |
$45,824
844,997
kWh
|
$16,320
-
kW-mo/yr
|
$3,207 |
$1,371
-
MMBtu
|
||
TOTAL IMPLEMENTED | $51,931 | $33,254 |
$45,033
830,402
kWh
|
$3,046
-
kW-mo/yr
|
$2,481 |
$1,371
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs