ITAC Assessment: NC0463
ITAC logo
ITAC Assessment: NC0463
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Hardwood flooring
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 180,000
ft2
Annual Production 12,000
thousand feet
Production Hrs. Annual 4,576
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,595 6,208,000
kWh
Electricity Demand $80,032 19,520
kW-mo/yr
Natural Gas $1,818 132
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,749

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $15,737 $15,000 $15,737
268,560
kWh
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,159 $1,400 $1,834
31,310
kWh
$325
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,208 $200 $2,575
43,968
kWh
$473
-
kW-mo/yr
- $(-600.0) $(-240.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,015 $1,124 $396
6,760
kWh
$38
-
kW-mo/yr
- $341 $240
05 2.7142: Utilize higher efficiency lamps and/or ballasts $24 $135 $3
56
kWh
$0.1
-
kW-mo/yr
- $14 $7
06 2.2437: Recover waste heat from equipment $4,367 $5,000 - - $4,367
-
MMBtu
- -
TOTAL RECOMMENDED $25,510 $22,859 $20,545
350,654
kWh
$836
-
kW-mo/yr
$4,367
-
MMBtu
$(-245.0) $7
TOTAL IMPLEMENTED $9,749 $7,724 $4,805
82,038
kWh
$836
-
kW-mo/yr
$4,367
-
MMBtu
$(-259.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings