Assessment Year | 2012 |
---|---|
Principal Product | Hardwood flooring |
NAICS | 321211: Hardwood Veneer and Plywood Manufacturing |
SIC | 2436: Softwood Veneer and Plywood |
Sales Range | $10 M to 50M |
# of Employees | 94 |
Plant Area |
180,000
ft2
|
Annual Production | 12,000
thousand feet
|
Production Hrs. Annual | 4,576
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $363,595 | 6,208,000 |
kWh
|
$0.059 |
Electricity Demand | $80,032 | 19,520 |
kW-mo/yr
|
$4.10 |
Natural Gas | $1,818 | 132 |
MMBtu
|
$13.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,749 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $15,737 | $15,000 |
$15,737
268,560
kWh
|
- | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,159 | $1,400 |
$1,834
31,310
kWh
|
$325
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,208 | $200 |
$2,575
43,968
kWh
|
$473
-
kW-mo/yr
|
- | $(-600.0) | $(-240.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,015 | $1,124 |
$396
6,760
kWh
|
$38
-
kW-mo/yr
|
- | $341 | $240 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24 | $135 |
$3
56
kWh
|
$0.1
-
kW-mo/yr
|
- | $14 | $7 | |
06 | 2.2437: Recover waste heat from equipment | $4,367 | $5,000 | - | - |
$4,367
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $25,510 | $22,859 |
$20,545
350,654
kWh
|
$836
-
kW-mo/yr
|
$4,367
-
MMBtu
|
$(-245.0) | $7 | ||
TOTAL IMPLEMENTED | $9,749 | $7,724 |
$4,805
82,038
kWh
|
$836
-
kW-mo/yr
|
$4,367
-
MMBtu
|
$(-259.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs