ITAC Assessment: TA0116
ITAC logo
ITAC Assessment: TA0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Heavy truck Part and Assembly
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 133,000
ft2
Annual Production 105,000
pieces
Production Hrs. Annual 4,980
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $386,272 5,431,414
kWh
Electricity Demand $82,635 14,411
kW-mo/yr
Natural Gas $138,918 9,240
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,371 $16,650 $19,340
292,326
kWh
$4,031
-
kW-mo/yr
- -
02 3.5316: Contract a wood pallet recycling company $13,000 - - - $13,000
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,000 $240 $2,483
37,522
kWh
$517
-
kW-mo/yr
- -
04 4.444: Install system to collect scrap $21,734 $1,600 $139
2,101
kWh
$835
-
kW-mo/yr
- $20,760
05 2.3132: Recharge batteries on during off-peak demand periods $1,820 - - $1,820
-
kW-mo/yr
- -
TOTAL RECOMMENDED $62,925 $18,490 $21,962
331,949
kWh
$7,203
-
kW-mo/yr
$13,000
-
MMBtu
$20,760
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs