79
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Hardwood veneer and plywood manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0638 #02 Y:2014 | 02 | 2014 | Improve air circulation with destratification fans / other methods | $28,255 | $27,375 | |
| OR0638 #01 Y:2014 | 01 | 2014 | Establish burner maintenance schedule for boilers | $237,276 | $62,840 | |
| OR0573 #07 Y:2011 | 07 | 2011 | Install soft-start to eliminate nuisance trips | $987 | $4,800 | |
| OR0573 #06 Y:2011 | 06 | 2011 | Flash condensate to produce lower pressure steam | $71,712 | $65,575 | |
| OR0573 #05 Y:2011 | 05 | 2011 | Install / repair insulation on steam lines | $11,543 | $7,806 | |
| OR0573 #04 Y:2011 | 04 | 2011 | Use or replace with energy efficient substitutes | $8,821 | $7,045 | |
| OR0573 #03 Y:2011 | 03 | 2011 | Use or replace with energy efficient substitutes | $5,064 | $7,045 | |
| OR0573 #02 Y:2011 | 02 | 2011 | Use or replace with energy efficient substitutes | $18,705 | $7,045 | |
| OR0573 #01 Y:2011 | 01 | 2011 | Reduce combustion air flow to optimum | $37,057 | $18,500 | |
| OR0564 #06 Y:2010 | 06 | 2010 | Install occupancy sensors | $7,248 | $31,290 | |
| OR0564 #05 Y:2010 | 05 | 2010 | Use optimum thickness insulation | $64,658 | $105,222 | |
| OR0564 #04 Y:2010 | 04 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $2,849 | $7,575 | |
| OR0564 #03 Y:2010 | 03 | 2010 | Upgrade controls on compressors | $9,666 | $40,000 | |
| OR0564 #02 Y:2010 | 02 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $31,314 | $31,314 | |
| OR0564 #01 Y:2010 | 01 | 2010 | Install soft-start to eliminate nuisance trips | $11,375 | $32,340 | |
| OR0555 #04 Y:2010 | 04 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $2,054 | $1 | |
| OR0555 #03 Y:2010 | 03 | 2010 | Remove or close off unneeded compressed air lines | $15,978 | $11,900 | |
| OR0555 #02 Y:2010 | 02 | 2010 | Install smaller boiler (increase high fire duty cycle) | $32,115 | $37,100 | |
| OR0555 #01 Y:2010 | 01 | 2010 | Improve combustion control capability | $257,883 | $405,450 | |
| OR0548 #08 Y:2009 | 08 | 2009 | Install / repair insulation on steam lines | $3,500 | $600 |