ITAC Assessment: OR0750
ITAC logo
ITAC Assessment: OR0750
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Custom Plywood Panel Products
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 360
Plant Area 255,100
ft2
Annual Production 1,600,000
units
Production Hrs. Annual 4,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $571,592 13,892,760
kWh
Electricity Demand $296,950 37,189
kW-mo/yr
Electricity Fees $63,793 -
Natural Gas $155,929 35,950
MMBtu
Waste Disposal Costs
Water Usage $33,746 9,175
Tgal
Water Disposal $132,475 9,094
Tgal
TOTAL YEARLY COSTS $1,254,485
RECOMMENDED SAVINGS* $328,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $8,607 - $6,559
159,187
kWh
$2,048
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,128 - $475
11,531
kWh
$653
-
kW-mo/yr
- -
03 2.4226: Use / purchase optimum sized compressor $32,591 $4,338 $32,591
791,036
kWh
- - -
04 3.2176: Increase use of automation $149,543 $65,909 - - - $149,543
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $87,087 $87,086 $76,649
1,860,403
kWh
$10,438
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $49,792 $155,954 - - $49,792 -
TOTAL RECOMMENDED $328,748 $313,287 $116,274
2,822,157
kWh
$13,139
-
kW-mo/yr
$49,792 $149,543
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs