Assessment Year | 2022 |
---|---|
Principal Product | Custom Plywood Panel Products |
NAICS | 321211: Hardwood Veneer and Plywood Manufacturing |
SIC | 2435: Hardwood Veneer and Plywood |
Sales Range | $50 M to 100M |
# of Employees | 360 |
Plant Area |
255,100
ft2
|
Annual Production | 1,600,000
units
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $571,592 | 13,892,760 |
kWh
|
$0.041 | |
Electricity Demand | $296,950 | 37,189 |
kW-mo/yr
|
$7.98 | |
Electricity Fees | $63,793 | - |
|
- | |
Natural Gas | $155,929 | 35,950 |
MMBtu
|
$4.34 | |
Waste Disposal Costs | |||||
Water Usage | $33,746 | 9,175 |
Tgal
|
$3.68 | |
Water Disposal | $132,475 | 9,094 |
Tgal
|
$14.57 | |
TOTAL YEARLY COSTS | $1,254,485 | ||||
RECOMMENDED SAVINGS* | $328,748 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,607 | - |
$6,559
159,187
kWh
|
$2,048
-
kW-mo/yr
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,128 | - |
$475
11,531
kWh
|
$653
-
kW-mo/yr
|
- | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $32,591 | $4,338 |
$32,591
791,036
kWh
|
- | - | - | |
04 | 3.2176: Increase use of automation | $149,543 | $65,909 | - | - | - | $149,543 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $87,087 | $87,086 |
$76,649
1,860,403
kWh
|
$10,438
-
kW-mo/yr
|
- | - | |
06 | 2.3212: Optimize plant power factor | $49,792 | $155,954 | - | - | $49,792 | - | |
TOTAL RECOMMENDED | $328,748 | $313,287 |
$116,274
2,822,157
kWh
|
$13,139
-
kW-mo/yr
|
$49,792 | $149,543 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs