681
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0679 #04 Y:2016 | 04 | 2016 | Use waste heat from hot flue gases to preheat | $31,513 | $47,575 | |
| OR0679 #03 Y:2016 | 03 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $10,003 | $10,369 | |
| OR0679 #02 Y:2016 | 02 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $20,472 | - | |
| OR0679 #01 Y:2016 | 01 | 2016 | Turn off equipment when not in use | $74,285 | $6,200 | |
| BS0088 #03 Y:2016 | 03 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $31,994 | $29,692 | |
| BS0088 #02 Y:2016 | 02 | 2016 | Lower operating pressure of condenser (steam) | $64,374 | $480 | |
| BS0088 #01 Y:2016 | 01 | 2016 | Install / repair insulation on steam lines | $7,541 | $11,782 | |
| BS0080 #07 Y:2016 | 07 | 2016 | Use waste heat from hot flue gases to preheat | $5,626 | $8,468 | |
| BS0080 #06 Y:2016 | 06 | 2016 | Utilize controls to operate equipment only when needed | $264 | $417 | |
| BS0080 #05 Y:2016 | 05 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $560 | $500 | |
| BS0080 #04 Y:2016 | 04 | 2016 | Use or replace with energy efficient substitutes | $4,926 | $8,600 | |
| BS0080 #03 Y:2016 | 03 | 2016 | Install compressor air intakes in coolest locations | $414 | $196 | |
| BS0080 #02 Y:2016 | 02 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,443 | $736 | |
| BS0080 #01 Y:2016 | 01 | 2016 | Turn off equipment when not in use | $15,244 | $1,250 | |
| UA0160 #07 Y:2016 | 07 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,220 | $2,995 | |
| UA0160 #06 Y:2016 | 06 | 2016 | Reduce the pressure of compressed air to the minimum required | $12,141 | $700 | |
| UA0160 #05 Y:2016 | 05 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $12,685 | $1,300 | |
| UA0160 #04 Y:2016 | 04 | 2016 | Use photocell controls | $3,368 | $1,162 | |
| UA0160 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $83,969 | $169,192 | |
| UA0160 #02 Y:2016 | 02 | 2016 | Reduce combustion air flow to optimum | $85,894 | - |