| Assessment Year | 2019 |
|---|---|
| Principal Product | Oriented Strand Board |
| NAICS | 321219: Reconstituted Wood Product Manufacturing |
| SIC | 2493: Reconstituted Wood Products |
| Sales Range | $100 M to 500M |
| # of Employees | 151 |
| Plant Area |
300,000
ft2
|
| Annual Production | 520,000
thousand feet
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,882,112 | 61,368,737 |
kWh
|
$0.047 |
| Electricity Demand | $1,556,106 | 97,260 |
kW-mo/yr
|
$16.00 |
| Natural Gas | $927,500 | 232,000 |
MMBtu
|
$4.00 |
| Wood | $1 | 2,200,000 |
MMBtu
|
$0.000 |
| TOTAL YEARLY COSTS | $5,365,719 | |||
| RECOMMENDED SAVINGS* | $92,391 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $37,704 | $24,212 |
$25,746
546,624
kWh
|
$11,958
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,403 | $200 |
$7,623
161,842
kWh
|
$3,540
-
kW-mo/yr
|
- | $(-2,880.0) | $(-2,880.0) | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $107 | $450 |
$107
2,282
kWh
|
- | - | - | - | |
| 04 | 2.4154: Avoid rewinding motors more than twice | $39,622 | $58,313 |
$27,055
574,424
kWh
|
$12,567
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $9,555 | $2,000 | - | - |
$9,555
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $92,391 | $85,175 |
$60,531
1,285,172
kWh
|
$28,065
-
kW-mo/yr
|
$9,555
-
MMBtu
|
$(-2,880.0) | $(-2,880.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs