ITAC Assessment: AS0131
ITAC logo
ITAC Assessment: AS0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product book binding
NAICS
n/a
SIC 2789: Bookbinding and Related Work
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 20,000
ft2
Annual Production 28,000,000
pieces
Production Hrs. Annual 5,148
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,912 668,230
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,447

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,284 $2,362 $1,284
12,603
kWh
02 2.4133: Use most efficient type of electric motors $3,456 $2,454 $3,456
33,998
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $124 - $124
1,172
kWh
04 2.6212: Turn off equipment during breaks, reduce operating time $1,722 $1,050 $1,722
16,999
kWh
05 2.7241: Install outside air damper / economizer on hvac unit $3,182 $6,400 $3,182
31,360
kWh
06 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,803 $990 $2,803
27,550
kWh
07 2.2511: Insulate bare equipment $247 $355 $247
2,345
kWh
TOTAL RECOMMENDED $12,818 $13,611 $12,818
126,027
kWh
TOTAL IMPLEMENTED $12,447 $13,256 $12,447
122,510
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs