Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

291

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0828 #06 Y:2026 Use solar heat to make electricty $56,750 $1,165,500
OR0828 #05 Y:2026 Use or replace with energy efficient substitutes $1,343,099 $12,884,730
OR0828 #04 Y:2026 Optimize plant power factor $2,860 $21,699
OR0828 #03 Y:2026 Modify process to reduce material use/cost $34,756 $10,000
OR0828 #02 Y:2026 Add equipment/ operators to reduce production bottleneck $12,537 $2,000
OR0828 #01 Y:2026 Eliminate or reduce compressed air usage $4,401 $50
OR0827 #07 Y:2026 Use solar heat to make electricty $34,776 $858,220
OR0827 #06 Y:2026 Optimize plant power factor $7,574 $55,435
OR0827 #05 Y:2026 Cover open tanks $1,065 $184
OR0827 #04 Y:2026 Recover waste heat from equipment $78,209 $1,612
OR0827 #03 Y:2026 Use optimum size and capacity equipment $2,712,540 $32,000
OR0827 #02 Y:2026 Utilize energy-efficient belts and other improved mechanisms $2,685 -
OR0827 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $6,835 -
OR0825 #05 Y:2026 Add equipment/ operators to reduce production bottleneck $37,391 $265,330
OR0825 #04 Y:2026 Use most efficient type of electric motors $5,237 $1,136
OR0825 #03 Y:2026 Eliminate or reduce compressed air usage $1,412 $163
OR0825 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $3,425 -
OR0825 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,124 -
OR0761 #04 Y:2022 Modify facility to avoid excess maintenance costs $31,013 $150,000
OR0761 #03 Y:2022 Optimize plant power factor $6,236 $26,406