| Assessment Year | 2026 |
|---|---|
| Principal Product | PLV |
| NAICS | 321212: Softwood Veneer and Plywood Manufacturing |
| SIC | 2436: Softwood Veneer and Plywood |
| Sales Range | $50 M to 100M |
| # of Employees | 24 |
| Plant Area |
155,000
ft2
|
| Annual Production | 2,250,000
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $373,100 | 4,974,000 |
kWh
|
$0.075 |
| Electricity Demand | $143,414 | 10,392 |
kW-mo/yr
|
$13.80 |
| Electricity Fees | $16,994 | - |
|
- |
| Natural Gas | $301,894 | 54,067 |
MMBtu
|
$5.58 |
| TOTAL YEARLY COSTS | $835,402 | |||
| RECOMMENDED SAVINGS* | $2,196,137 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Primary Product Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $4,401 | $50 |
$4,401
58,600
kWh
|
- | - | - | - | - | |
| 02 | 4.111: Add equipment/ operators to reduce production bottleneck | $21,492 | $2,000 | - | - | - | - | $21,492 | - | |
| 03 | 4.131: Modify process to reduce material use/cost | $14,774 | $10,000 |
$(-3,676.0)
(-49,003)
kWh
|
- | - | - | $18,450 | - | |
| 04 | 2.3212: Optimize plant power factor | $2,860 | $21,699 | - | - | $2,860 | - | - | - | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $2,095,860 | $12,883,197 |
$17,257
230,066
kWh
|
$155
-
kW-mo/yr
|
- | $140,000 | - | $1,938,448 | |
| 06 | 2.9114: Use solar heat to make electricty | $56,750 | $1,165,500 |
$56,750
756,561
kWh
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $2,196,137 | $14,082,446 |
$74,732
996,224
kWh
|
$155
-
kW-mo/yr
|
$2,860 | $140,000 | $39,942 | $1,938,448 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Primary Product Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs