ITAC Assessment: OR0828
ITAC logo
ITAC Assessment: OR0828
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product PLV
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 24
Plant Area 155,000
ft2
Annual Production 2,250,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $373,100 4,974,000
kWh
Electricity Demand $143,414 10,392
kW-mo/yr
Electricity Fees $16,994 -
Natural Gas $301,894 54,067
MMBtu
TOTAL YEARLY COSTS $835,402
RECOMMENDED SAVINGS* $2,196,137 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
01 2.4239: Eliminate or reduce compressed air usage $4,401 $50 $4,401
58,600
kWh
- - - - -
02 4.111: Add equipment/ operators to reduce production bottleneck $21,492 $2,000 - - - - $21,492 -
03 4.131: Modify process to reduce material use/cost $14,774 $10,000 $(-3,676.0)
(-49,003)
kWh
- - - $18,450 -
04 2.3212: Optimize plant power factor $2,860 $21,699 - - $2,860 - - -
05 2.4322: Use or replace with energy efficient substitutes $2,095,860 $12,883,197 $17,257
230,066
kWh
$155
-
kW-mo/yr
- $140,000 - $1,938,448
06 2.9114: Use solar heat to make electricty $56,750 $1,165,500 $56,750
756,561
kWh
- - - - -
TOTAL RECOMMENDED $2,196,137 $14,082,446 $74,732
996,224
kWh
$155
-
kW-mo/yr
$2,860 $140,000 $39,942 $1,938,448
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs