ITAC Assessment: OR0827
ITAC logo
ITAC Assessment: OR0827
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wood Veneer
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 71
Plant Area 130,000
ft2
Annual Production 321,338
units
Production Hrs. Annual 4,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $761,036 11,040,000
kWh
Electricity Demand $398,910 28,933
kW-mo/yr
Electricity Fees $63,720 -
Natural Gas $563,186 106,665
MMBtu
TOTAL YEARLY COSTS $1,786,852
RECOMMENDED SAVINGS* $2,843,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,835 - $4,618
66,995
kWh
$2,217
-
kW-mo/yr
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,685 - $1,678
24,342
kWh
$1,007
-
kW-mo/yr
- - - -
03 2.4323: Use optimum size and capacity equipment $2,712,540 $32,000 - - - - $78,384 $2,634,156
04 2.2437: Recover waste heat from equipment $78,209 $1,612 $2,043
29,635
kWh
- - $7,206
-
MMBtu
- $68,960
05 2.2514: Cover open tanks $1,065 $184 - - - $1,065
-
MMBtu
- -
06 2.3212: Optimize plant power factor $7,574 $55,435 - - $7,574 - - -
07 2.9114: Use solar heat to make electricty $34,776 $600,754 $34,776
504,518
kWh
- - - - -
TOTAL RECOMMENDED $2,843,684 $689,985 $43,115
625,490
kWh
$3,224
-
kW-mo/yr
$7,574 $8,271
-
MMBtu
$78,384 $2,703,116
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs