Assessment Year | 1999 |
---|---|
Principal Product | Bottling Distilled Spirits |
NAICS |
n/a
|
SIC | 2085: Distilled and Blended Liquors |
Sales Range | $50 M to 100M |
# of Employees | 196 |
Plant Area |
152,160
ft2
|
Annual Production | 5,400,000
pieces
|
Production Hrs. Annual | 2,188
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $181,409 | 5,139,508 |
kWh
|
$0.035 |
Electricity Demand | $24,137 | 16,445 |
kW-mo/yr
|
$1.47 |
Natural Gas | $109,000 | 27,116 |
MMBtu
|
$4.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,640 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,248 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,210 | $50 |
$2,715
77,081
kWh
|
$495
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,678 | $261 |
$1,420
40,152
kWh
|
$258
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $594 | - |
$594
16,706
kWh
|
- | - | - | - | |
04 | 3.1191: Change procedures / equipment / operating conditions | $5,027 | $4,475 | - | - |
$2,640
-
lb
|
- | $2,387 | |
05 | 3.5313: Increase amount of waste recovered for resale | $7,011 | $9,500 | - | - |
$1,086
-
lb
|
- | $5,925 | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $10,120 | - | - | - | - | $10,120 | - | |
TOTAL RECOMMENDED | $27,640 | $14,286 |
$4,729
133,939
kWh
|
$753
-
kW-mo/yr
|
$3,726
-
lb
|
$10,120 | $8,312 | ||
TOTAL IMPLEMENTED | $15,248 | $14,025 |
$2,715
77,081
kWh
|
$495
-
kW-mo/yr
|
$3,726
-
lb
|
- | $8,312 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs