ITAC Assessment: UL0233
ITAC logo
ITAC Assessment: UL0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Bottling Distilled Spirits
NAICS
n/a
SIC 2085: Distilled and Blended Liquors
Sales Range $50
M
to 100
M
# of Employees 196
Plant Area 152,160
ft2
Annual Production 5,400,000
pieces
Production Hrs. Annual 2,188
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,409 5,139,508
kWh
Electricity Demand $24,137 16,445
kW-mo/yr
Natural Gas $109,000 27,116
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,248

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,210 $50 $2,715
77,081
kWh
$495
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $1,678 $261 $1,420
40,152
kWh
$258
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $594 - $594
16,706
kWh
- - - -
04 3.1191: Change procedures / equipment / operating conditions $5,027 $4,475 - - $2,640
-
lb
- $2,387
05 3.5313: Increase amount of waste recovered for resale $7,011 $9,500 - - $1,086
-
lb
- $5,925
06 4.111: Add equipment/ operators to reduce production bottleneck $10,120 - - - - $10,120 -
TOTAL RECOMMENDED $27,640 $14,286 $4,729
133,939
kWh
$753
-
kW-mo/yr
$3,726
-
lb
$10,120 $8,312
TOTAL IMPLEMENTED $15,248 $14,025 $2,715
77,081
kWh
$495
-
kW-mo/yr
$3,726
-
lb
- $8,312
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs