ITAC Assessment: OR0825
ITAC logo
ITAC Assessment: OR0825
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Laminated Wood Panels
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 150,000
ft2
Annual Production 45,000,000
units
Production Hrs. Annual 2,040
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,980 1,294,200
kWh
Electricity Demand $142,839 9,947
kW-mo/yr
Electricity Fees $16,667 -
Natural Gas $66,221 7,738
MMBtu
LPG $39,151 1,446
MMBtu
Waste Disposal Costs
Water Usage $5,800 1
Tgal
TOTAL YEARLY COSTS $369,658
RECOMMENDED SAVINGS* $57,938 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,124 - $7,727
101,031
kWh
$2,397
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,425 - $1,961
25,637
kWh
$1,464
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $1,412 $163 $1,412
18,466
kWh
- -
04 2.4133: Use most efficient type of electric motors $5,237 $1,136 $2,568
33,577
kWh
$2,669
-
kW-mo/yr
-
05 4.111: Add equipment/ operators to reduce production bottleneck $37,740 $265,330 - - $37,740
TOTAL RECOMMENDED $57,938 $266,629 $13,668
178,711
kWh
$6,530
-
kW-mo/yr
$37,740
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs