| Assessment Year | 2026 |
|---|---|
| Principal Product | Laminated Wood Panels |
| NAICS | 321211: Hardwood Veneer and Plywood Manufacturing |
| SIC | 2435: Hardwood Veneer and Plywood |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
150,000
ft2
|
| Annual Production | 45,000,000
units
|
| Production Hrs. Annual | 2,040
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $98,980 | 1,294,200 |
kWh
|
$0.076 | |
| Electricity Demand | $142,839 | 9,947 |
kW-mo/yr
|
$14.36 | |
| Electricity Fees | $16,667 | - |
|
- | |
| Natural Gas | $66,221 | 7,738 |
MMBtu
|
$8.56 | |
| LPG | $39,151 | 1,446 |
MMBtu
|
$27.08 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,800 | 1 |
Tgal
|
$5,800.00 | |
| TOTAL YEARLY COSTS | $369,658 | ||||
| RECOMMENDED SAVINGS* | $57,938 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,124 | - |
$7,727
101,031
kWh
|
$2,397
-
kW-mo/yr
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,425 | - |
$1,961
25,637
kWh
|
$1,464
-
kW-mo/yr
|
- | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $1,412 | $163 |
$1,412
18,466
kWh
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $5,237 | $1,136 |
$2,568
33,577
kWh
|
$2,669
-
kW-mo/yr
|
- | |
| 05 | 4.111: Add equipment/ operators to reduce production bottleneck | $37,740 | $265,330 | - | - | $37,740 | |
| TOTAL RECOMMENDED | $57,938 | $266,629 |
$13,668
178,711
kWh
|
$6,530
-
kW-mo/yr
|
$37,740 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs