ITAC Assessment: DL0163
ITAC logo
ITAC Assessment: DL0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Books, Pamphlets and Coupons
NAICS 323117: Books Printing
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 400,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,597 3,742,940
kWh
Electricity Demand $110,601 11,113
kW-mo/yr
Electricity Fees $4,809 -
Natural Gas $10,648 1,098
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,740

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7313: Recycle air for heating, ventilation and air conditioning $30,630 $2,700 $30,630
413,940
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,570 $200 $2,570
34,720
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,160 $7,000 $6,050
81,690
kWh
$1,110
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $29,110 $55,940 $22,980
310,555
kWh
$6,130
-
kW-mo/yr
TOTAL RECOMMENDED $69,470 $65,840 $62,230
840,905
kWh
$7,240
-
kW-mo/yr
TOTAL IMPLEMENTED $59,740 $58,640 $53,610
724,495
kWh
$6,130
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs