ITAC Assessment: UL0218
ITAC logo
ITAC Assessment: UL0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product air brake components for large trucks
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 378
Plant Area 180,000
ft2
Annual Production 9,000,000,000
pieces
Production Hrs. Annual 8,592
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $317,746 14,267,585
kWh
Electricity Demand $127,063 23,141
kW-mo/yr
Natural Gas $20,656 10,205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $649,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $8,888 $54,400 n/a - - $8,888
-
MMBtu
- - - -
02 2.7111: Reduce illumination to minimum necessary levels $12,793 $960 n/a $7,521
337,339
kWh
$2,536
-
kW-mo/yr
- - - $360 $2,376
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,065 $20 n/a $790
55,686
kWh
$275
-
kW-mo/yr
- - - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $26,207 $8,168 n/a - - - $26,207
-
lb
- - -
05 4.821: Pay bills on time to avoid late fees $1,142 - n/a - - - - - - $1,142
06 4.431: Train operators for maximum operating efficiency $599,716 $24,482 n/a - - - - $599,716 - -
TOTAL RECOMMENDED $649,811 $88,030 $8,311
393,025
kWh
$2,811
-
kW-mo/yr
$8,888
-
MMBtu
$26,207
-
lb
$599,716 $360 $3,518
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs