Assessment Year | 2022 |
---|---|
Principal Product | Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
32,000
ft2
|
Annual Production | 5,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $253,162 | 3,152,700 |
kWh
|
$0.080 | |
Electricity Demand | $19,408 | 4,840 |
kW-mo/yr
|
$4.01 | |
Electricity Fees | $1,912 | - |
|
- | |
Natural Gas | $60,657 | 6,455 |
MMBtu
|
$9.40 | |
Waste Disposal Costs | |||||
Water Usage | $83,964 | 10,589 |
Tgal
|
$7.93 | |
Water Disposal | $204,799 | 10,500 |
Tgal
|
$19.51 | |
TOTAL YEARLY COSTS | $623,901 | ||||
RECOMMENDED SAVINGS* | $12,125 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $12,125 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,718 | - |
$5,352
66,656
kWh
|
$366
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $567 | $122 |
$531
6,608
kWh
|
$36
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $999 | $2,199 |
$989
12,311
kWh
|
$11
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,058 | $2,080 |
$3,741
46,590
kWh
|
$317
-
kW-mo/yr
|
- | |
05 | 2.7224: Reduce space conditioning during non-working hours | $782 | - | - | - |
$782
-
MMBtu
|
|
TOTAL RECOMMENDED | $12,125 | $4,401 |
$10,612
132,165
kWh
|
$731
-
kW-mo/yr
|
$782
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,125 | $4,401 |
$10,612
132,165
kWh
|
$731
-
kW-mo/yr
|
$782
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs