Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0794 #04 Y:2008 Upgrade controls on compressors $9,841 $10,000
UD0794 #03 Y:2008 Use plant owned transformers or lease transformers $20,779 $50,000
UD0794 #02 Y:2008 Reschedule plant operations or reduce load to avoid peaks $46,758 -
UD0794 #01 Y:2008 Redesign process $60,982 $300,000
UF0416 #07 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $21,708 $1,477
UF0416 #06 Y:2008 Utilize higher efficiency lamps and/or ballasts $39,189 $227,490
UF0416 #05 Y:2008 Develop a repair/replace policy $5,057 -
UF0416 #04 Y:2008 Reduce the pressure of compressed air to the minimum required $5,217 -
UF0416 #03 Y:2008 Install timers and/or thermostats $53,629 $49,236
UF0416 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $70,300 $53,500
UF0416 #01 Y:2008 Repair faulty insulation in furnaces, boilers, etc $950 $4,000
OR0537 #08 Y:2008 Eliminate old stock and modify inventory control $179,500 $279,600
OR0537 #07 Y:2008 Use optimum thickness insulation $11,928 $5,611
OR0537 #06 Y:2008 Establish a predictive maintenance program $3,113 -
OR0537 #05 Y:2008 Size electric motors for peak operating efficiency $4,386 $18,550
OR0537 #04 Y:2008 Install occupancy sensors $10,283 $27,375
OR0537 #03 Y:2008 Reduce scrap production $131,635 $140,000
OR0537 #02 Y:2008 Reduce defects by reducing product tipping $56,459 $10,000
OR0537 #01 Y:2008 Install direct acting units in place of compressed air pressure system in safety system $34,473 $24,900
OR0530 #07 Y:2008 Optimize plant power factor $27,360 $114,000