Assessment Year | 2008 |
---|---|
Principal Product | playwood |
NAICS | 321212: Softwood Veneer and Plywood Manufacturing |
SIC | 2435: Hardwood Veneer and Plywood |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
245,000
ft2
|
Annual Production | 212,000
thousand feet
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $4,385,552 | 56,090,677 |
kWh
|
$0.078 |
Other Gas | $130,752 | 5,883,676 |
MMBtu
|
$0.022 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $196,050 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $98,175 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $950 | $4,000 | - | - |
$950
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $70,300 | $53,500 |
$70,300
938,000
kWh
|
- | - | - | |
03 | 2.7261: Install timers and/or thermostats | $53,629 | $49,236 | - | - | - | $53,629 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,217 | - |
$5,217
66,886
kWh
|
- | - | - | |
05 | 2.4151: Develop a repair/replace policy | $5,057 | - |
$5,057
57,952
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $39,189 | $227,490 | - |
$39,189
-
kW-mo/yr
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,708 | $1,477 | - |
$21,708
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $196,050 | $335,703 |
$80,574
1,062,838
kWh
|
$60,897
-
kW-mo/yr
|
$950
-
MMBtu
|
$53,629 | ||
TOTAL IMPLEMENTED | $98,175 | $58,977 |
$75,517
1,004,886
kWh
|
$21,708
-
kW-mo/yr
|
$950
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs