ITAC Assessment: OR0530
ITAC logo
ITAC Assessment: OR0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Particle Board
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $100
M
to 500
M
# of Employees 320
Plant Area 325,930
ft2
Annual Production 177,650,000
pieces
Production Hrs. Annual 2,920
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,587,800 57,378,000
kWh
Natural Gas $3,362,351 3,261,252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $238,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4112: Install soft-start to eliminate nuisance trips $84,400 $21,000 $84,400
2,286,864
kWh
- -
02 2.123: Maintenance $70,600 $500 - - $70,600
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,500 $24,110 $31,500
761,000
kWh
- -
04 2.2127: Flash condensate to produce lower pressure steam $13,800 $11,475 - - $13,800
-
MMBtu
05 2.6218: Turn off equipment when not in use $5,580 $4,200 $5,580
151,400
kWh
- -
06 2.612: General $4,900 $500 $4,900
132,678
kWh
- -
07 2.3212: Optimize plant power factor $27,360 $114,000 - $27,360
-
kW-mo/yr
-
TOTAL RECOMMENDED $238,140 $175,785 $126,380
3,331,942
kWh
$27,360
-
kW-mo/yr
$84,400
-
MMBtu
TOTAL IMPLEMENTED $75,500 $1,000 $4,900
132,678
kWh
- $70,600
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs