Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

686

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0425 #03 Y:2009 Utilize higher efficiency lamps and/or ballasts $61,944 $21,313
UF0425 #02 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $2,129 $456
UF0425 #01 Y:2009 Reduce the pressure of compressed air to the minimum required $9,286 -
OR0545 #06 Y:2009 Install occupancy sensors $8,600 $35,300
OR0545 #05 Y:2009 Use most efficient type of electric motors $19,200 $58,700
OR0545 #04 Y:2009 Use waste heat from hot flue gases to preheat $9,100 $24,800
OR0545 #03 Y:2009 Consider intermediate or economy size autos / trucks $149,500 $380,000
OR0545 #02 Y:2009 Install / repair insulation on steam lines $2,700 $4,100
OR0545 #01 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $40,900 $40,900
UD0794 #09 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $1,223 $1,000
UD0794 #08 Y:2008 Reduce the pressure of compressed air to the minimum required $3,202 -
UD0794 #07 Y:2008 Upgrade controls on compressors $3,255 -
UD0794 #06 Y:2008 Change rate schedules or other changes in utility service $6,273 $1,000
UD0794 #05 Y:2008 Utilize controls to operate equipment only when needed $7,981 $19,425
UD0794 #04 Y:2008 Upgrade controls on compressors $9,841 $10,000
UD0794 #03 Y:2008 Use plant owned transformers or lease transformers $20,779 $50,000
UD0794 #02 Y:2008 Reschedule plant operations or reduce load to avoid peaks $46,758 -
UD0794 #01 Y:2008 Redesign process $60,982 $300,000
UF0416 #07 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $21,708 $1,477
UF0416 #06 Y:2008 Utilize higher efficiency lamps and/or ballasts $39,189 $227,490