ITAC Assessment: UF0425
ITAC logo
ITAC Assessment: UF0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product ceiling tiles
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 1,132,560
ft2
Annual Production 150,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,564,459 34,327,218
kWh
Natural Gas $141,314 70,657
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $252,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $228,223

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,286 - $9,286
124,306
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,129 $456 $2,129
28,505
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $61,944 $21,313 $61,943
829,222
kWh
$1
-
kW-mo/yr
- -
04 2.7124: Make a practice of turning off lights when not needed $6,908 $1,600 $6,908
92,481
kWh
- - -
05 2.7243: Improve air circulation with destratification fans / other methods $14,600 $12,400 $14,600
-
kWh
- - -
06 2.4151: Develop a repair/replace policy $1,195 - $1,195
13,917
kWh
- - -
07 2.4156: Establish a preventative maintenance program $41,811 $2,400 $41,810
559,713
kWh
$1
-
kW-mo/yr
- -
08 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,702 $1,800 - - $2,702
-
MMBtu
-
09 2.1131: Repair faulty insulation in furnaces, boilers, etc $52,516 $31,860 - - $52,516
-
MMBtu
-
10 2.4133: Use most efficient type of electric motors $59,018 $139,322 $59,017
790,056
kWh
$1
-
kW-mo/yr
- -
11 3.5316: Contract a wood pallet recycling company $525 - - - - $525
TOTAL RECOMMENDED $252,634 $211,151 $196,888
2,438,200
kWh
$3
-
kW-mo/yr
$55,218
-
MMBtu
$525
TOTAL IMPLEMENTED $228,223 $198,751 $173,002
2,313,894
kWh
$3
-
kW-mo/yr
$55,218
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs