ITAC Assessment: OR0545
ITAC logo
ITAC Assessment: OR0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Plywood
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $100
M
to 500
M
# of Employees 355
Plant Area 540,000
ft2
Annual Production 300,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $934,352 25,480,000
kWh
Electricity Demand $105,084 48,204
kW-mo/yr
Electricity Fees $166,064 -
Natural Gas $48,776 6,975
MMBtu
Other Energy $3,199,626 533,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $230,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $40,900 $40,900 $40,900
1,115,000
kWh
- - -
02 2.2136: Install / repair insulation on steam lines $2,700 $4,100 - - $2,700
-
MMBtu
-
03 2.8221: Consider intermediate or economy size autos / trucks $149,500 $380,000 - - - $149,500
04 2.2414: Use waste heat from hot flue gases to preheat $9,100 $24,800 - $9,100
-
MMBtu
- -
05 2.4133: Use most efficient type of electric motors $19,200 $58,700 $19,200
524,100
kWh
- - -
06 2.7135: Install occupancy sensors $8,600 $35,300 $8,600
159,300
kWh
- - -
TOTAL RECOMMENDED $230,000 $543,800 $68,700
1,798,400
kWh
$9,100
-
MMBtu
$2,700
-
MMBtu
$149,500
TOTAL IMPLEMENTED $68,700 $134,900 $68,700
1,798,400
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs