| Assessment Year | 2009 |
|---|---|
| Principal Product | Plywood |
| NAICS | 321212: Softwood Veneer and Plywood Manufacturing |
| SIC | 2436: Softwood Veneer and Plywood |
| Sales Range | $100 M to 500M |
| # of Employees | 355 |
| Plant Area |
540,000
ft2
|
| Annual Production | 300,000
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $934,352 | 25,480,000 |
kWh
|
$0.037 |
| Electricity Demand | $105,084 | 48,204 |
kW-mo/yr
|
$2.18 |
| Electricity Fees | $166,064 | - |
|
- |
| Natural Gas | $48,776 | 6,975 |
MMBtu
|
$6.99 |
| Other Energy | $3,199,626 | 533,271 |
MMBtu
|
$6.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $230,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $68,700 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $40,900 | $40,900 |
$40,900
1,115,000
kWh
|
- | - | - | |
| 02 | 2.2136: Install / repair insulation on steam lines | $2,700 | $4,100 | - | - |
$2,700
-
MMBtu
|
- | |
| 03 | 2.8221: Consider intermediate or economy size autos / trucks | $149,500 | $380,000 | - | - | - | $149,500 | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $9,100 | $24,800 | - |
$9,100
-
MMBtu
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $19,200 | $58,700 |
$19,200
524,100
kWh
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $8,600 | $35,300 |
$8,600
159,300
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $230,000 | $543,800 |
$68,700
1,798,400
kWh
|
$9,100
-
MMBtu
|
$2,700
-
MMBtu
|
$149,500 | ||
| TOTAL IMPLEMENTED | $68,700 | $134,900 |
$68,700
1,798,400
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs