Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

705

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0825 #04 Y:2026 Use most efficient type of electric motors $5,237 $1,136
OR0825 #03 Y:2026 Eliminate or reduce compressed air usage $1,412 $163
OR0825 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $3,425 -
OR0825 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,124 -
WM0252 #05 Y:2025 Reduce space conditioning during non-working hours $399 $3,550
WM0252 #04 Y:2025 Install compressor air intakes in coolest locations $566 $3,607
WM0252 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $692 -
WM0252 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,152 $4,060
WM0252 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,906 $17,664
UD1107 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,839 $5,280
UD1107 #04 Y:2025 Eliminate or reduce compressed air usage $412 $900
UD1107 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,345 $953
UD1107 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $69,274 -
UD1107 #01 Y:2025 Optimize plant power factor $228,685 $136,500
SJ0020 #08 Y:2024 Replace fossil fuel equipment with electrical equipment $2,868 $15,989
SJ0020 #07 Y:2024 Convert combustion equipment to burn natural gas $2,380 -
SJ0020 #06 Y:2024 Lower temperature during the winter season and vice-versa $2,851 -
SJ0020 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $1,344 -
SJ0020 #04 Y:2024 Install occupancy sensors $178 $770
SJ0020 #03 Y:2024 Install occupancy sensors $156 $358