Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

714

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Sawmills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0801 #06 Y:2024 Use solar heat to make electricty $6,884 $92,435
OR0801 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,786 $5,438
OR0801 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $2,400 $6,763
OR0801 #03 Y:2024 Optimize plant power factor $15,143 $44,093
OR0801 #02 Y:2024 Provide proper maintenance of motor driven equipment $42,000 $50,000
OR0801 #01 Y:2024 Modify process to reduce material use/cost $1,848 -
GT0983 #03 Y:2024 Use solar heat to make electricty $101,821 $1,492,532
GT0983 #02 Y:2024 Turn off equipment during breaks, reduce operating time $566 $1,625
GT0983 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $51,238 $1,850
UW2412 #08 Y:2024 Use / purchase optimum sized compressor $2,736 $2,075
UW2412 #07 Y:2024 Install occupancy sensors $8,042 $6,294
UW2412 #06 Y:2024 Use most efficient type of electric motors $8,451 $2,000
UW2412 #05 Y:2024 Install / repair insulation on steam lines $2,420 $1,600
UW2412 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $1,335 -
UW2412 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $5,336 $2,080
UW2412 #02 Y:2024 Insulate bare equipment $815 $4,530
UW2412 #01 Y:2024 Repair or replace steam traps $6,073 $3,600
LT8396 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $2,479 $1,067
LT8396 #02 Y:2024 Optimize plant power factor $7,412 $31,808
LT8396 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,001 $2,360