Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

735

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Sawmills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2601 #05 Y:2026 Replace fossil fuel equipment with electrical equipment $54,790 $497,400
UW2601 #04 Y:2026 Install compressor air intakes in coolest locations $17,525 $8,362
UW2601 #03 Y:2026 Optimize plant power factor $37,270 $40,918
UW2601 #02 Y:2026 Eliminate or reduce compressed air usage $56,903 $23,111
UW2601 #01 Y:2026 Burn wood by-products for heat $45,129 $646,222
OR0816 #05 Y:2025 Repair or replace steam traps $5,263 $45,752
OR0816 #04 Y:2025 Optimize plant power factor $18,312 $120,179
OR0816 #03 Y:2025 Replace existing hvac unit with high efficiency model $8,154 $40,218
OR0816 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $33,221 $16,610
OR0816 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $12,434 -
MU0071 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $442 $1,277
MU0071 #03 Y:2025 Install occupancy sensors $1,188 $3,637
MU0071 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,851 $577
MU0071 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $25,925 $65,000
LT8415 #04 Y:2024 Change rate schedules or other changes in utility service $7,019 -
LT8415 #03 Y:2024 Turn off equipment when not in use $297 $496
LT8415 #02 Y:2024 Make a practice of turning off lights when not needed $1,473 -
LT8415 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $19,477 $355
LT8416 #03 Y:2024 Re-arrange equipment layout to reduce handling costs $28,423 $1,070
LT8416 #02 Y:2024 Reduce heat gain by window tinting $463 $400