902
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OR0801 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $6,884 | $92,435 |
n/a
|
OR0801 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,786 | $5,438 |
n/a
|
OR0801 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $2,400 | $6,763 |
n/a
|
OR0801 #03 Y:2024 | 03 | 2024 | Optimize plant power factor | $15,143 | $44,093 |
n/a
|
OR0801 #02 Y:2024 | 02 | 2024 | Provide proper maintenance of motor driven equipment | $42,000 | $50,000 |
n/a
|
OR0801 #01 Y:2024 | 01 | 2024 | Modify process to reduce material use/cost | $1,848 | - |
n/a
|
GT0983 #03 Y:2024 | 03 | 2024 | Use solar heat to make electricty | $101,821 | $1,492,532 |
n/a
|
GT0983 #02 Y:2024 | 02 | 2024 | Turn off equipment during breaks, reduce operating time | $566 | $1,625 |
n/a
|
GT0983 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $51,238 | $1,850 |
n/a
|
UW2412 #08 Y:2024 | 08 | 2024 | Use / purchase optimum sized compressor | $2,736 | $2,075 |
n/a
|
UW2412 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $8,042 | $6,294 |
n/a
|
UW2412 #06 Y:2024 | 06 | 2024 | Use most efficient type of electric motors | $8,451 | $2,000 |
n/a
|
UW2412 #05 Y:2024 | 05 | 2024 | Install / repair insulation on steam lines | $2,420 | $1,600 |
n/a
|
UW2412 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,335 | - |
n/a
|
UW2412 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,336 | $2,080 |
n/a
|
UW2412 #02 Y:2024 | 02 | 2024 | Insulate bare equipment | $815 | $4,530 |
n/a
|
UW2412 #01 Y:2024 | 01 | 2024 | Repair or replace steam traps | $6,073 | $3,600 |
n/a
|
LT8396 #03 Y:2024 | 03 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $2,479 | $1,067 |
n/a
|
LT8396 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $7,412 | $31,808 |
n/a
|
LT8396 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,001 | $2,360 |
n/a
|